French Open 2025 Final: Carlos Alcaraz saves three match points, outlasts Jannik Sinner to defend Roland-Garros crown | Tennis News

Carlos Alcaraz (AP Photo) NEW DELHI: Carlos Alcaraz has once again cemented his status as one of tennis’s brightest stars by retaining his 2025 French Open men’s singles title in a gripping final against Jannik Sinner. The Spaniard overcame a daunting two-set deficit and saved three match points in a marathon battle that stretched mind-boggling…

Read More

THIS Japanese walking technique is better than HIIT, here’s how |

Japanese walking, or Interval Walking Training (IWT), is gaining popularity as a fitness trend due to its impressive health benefits achieved with minimal time and equipment. Developed in Japan, this technique alternates between high and low-intensity walking intervals. Studies suggest IWT can lead to weight loss, lower blood pressure, and improved muscle strength, potentially contributing…

Read More

Delhi infrastructure project: Centre approves Rs 24,000-crore plan to decongest Delhi; Tunnel to link Mahipalpur to Vasant Kunj

Delhi chief minister Rekha Gupta on Sunday announced that the Centre had given a green signal to infrastructure projects worth Rs 24,000 crore, aimed at easing traffic congestion and reducing pollution in the capital and its surrounding areas. Among the key developments is a five-kilometre tunnel connecting Shiv Murti–Mahipalpur on the Dwarka Expressway with Nelson…

Read More

Kylian Mbappé scores 50th goal; France defeat Germany 2-0, finish third in Nations League | Football News

France’s Kylian Mbappe (Marijan Murat/dpa via AP) France secured a 2-0 victory over Germany in the UEFA Nations League third-place match in Munich on Saturday, with Kylian Mbappé scoring his 50th international goal and assisting another, while Spain and Portugal prepared for the final on Sunday.Mbappé opened the scoring just before halftime after being set…

Read More

Tata Steel new plant: $1.5-billion electric arc furnace facility to come up at Port Talbot; UK government gives 500 million pounds

Tata Steel will be beginning the construction of its state-of-the-art electric arc furnace (EAF) facility at Port Talbot, Wales, in July 2025, with production expected to commence by 2027. The company confirmed in its FY24-25 annual report that all key approvals for the $1.5 billion project are now in place.Backed by 500 million pounds in…

Read More